[[Introduction]][[Proposed Improvements]][[Contacts & Links]][[News]][[Archive]]
 
  Traffic Studies



Problems
Studies

Objectives

Proposals
Timings
Progress
Video
Interactive
Map

A Study has been made of the traffic movements through and around Handy Cross Junction.

Traffic flows have been modeled in a special computer program called PARAMICS which models individual vehicle movements, through Handy Cross and the road network immediately to the north.

This enables

  • Interaction between the junctions
  • Detailed traffic variation over the peak period to be modeled.
  • Variation in signal timings to be tested.

(Movement Diagram for AM Peak Period)
Major turning movement diagram for the AM peak period (06.30 - 09.30) at Handy Cross

The traffic model studies have shown the complex relationship between the local and trunk road network.

Exit blocking from one junction impacts on the ability of an adjacent junction to function properly. Consequently a range of improvements to both the trunk road network and the local road network will be required to reduce congestion at Handy Cross and the surrounding area.

The Highways Agency and Buckinghamshire County Council / Wycombe District Council are now developing various schemes to reduce congestion, which complement one another. These were highlighted at a joint Public Exhibition in November 2002 to show the proposed transport improvements in the Handy Cross and Cressex areas of High Wycombe at the Hilltop Community Centre.

[ Introduction | Proposed Improvements | Contacts & Links | News | Archive ]