| Short Term Measures |
|
|
|
|
While the Integrated Transport Study investigations were ongoing a number of short term measures were identified at Handy Cross, which were noncontentious and easy to implement. These were designed to prevent the junction from 'locking up' at peak times and included:-
These were implemented in 2000 - 01 |
|
|