  Short Term Measures



 

(Sign on roundabout)

While the Integrated Transport Study investigations were ongoing a number of short term measures were identified at Handy Cross, which were noncontentious and easy to implement. These were designed to prevent the junction from 'locking up' at peak times and included:-

  • Improvements to the roundabout geometry.
  • Improvements to carriageway markings.
  • Improvements to signing on the junction approaches and on the roundabout.
  • Renewal of traffic signal installation.
  • Updating traffic signal control software and operation.
  • Improved traffic signal remote monitoring including CCTV.

These were implemented in 2000 - 01